The short answer

Wait if the headliner or the joinery is coming down anyway. Ducting, wiring and insulation are dramatically cheaper when the boat is already open, and retrofitting a duct run behind finished joinery is where a quote gets expensive. Fit now if you are about to spend a summer aboard without it.

Boat AC Retrofit Timing and Access — Requirements and Limitations

The largest variable in an installed price is access. A duct run through a bulkhead that is already exposed is an hour; the same run behind a fitted liner can be a day, plus the risk that the joinery does not go back the way it came out.

If a refit is a year away and the boat lives in Cairns, the calculation changes — a summer of not sleeping has a cost too. But if it is a few months out, waiting usually saves more than it costs.

Each of these answers a different part of the same problem.